SCHEDULE OF USER RATES AND CHARGES - Effective January 1, 2022

Payments are due on the 15th of every month**See note at bottom of page.

 

FEES FOR ESTABLISHING NEW ACCOUNT

For a new customer on an existing service address (Billed on first monthly bill)

  • $150.00 Deposit

  • $75.00 Account Service Fee

For a new service at a new service address (Billed on first monthly bill)

  • $150.00 Deposit

  • $75.00 Account Service Fee

  • $450.00 Meter Charge

 

LATE CHARGES

     $10 per account

     Plus 1.5% of outstanding balance

 

RETURNED CHECK CHARGES

     $25 per returned check

 

RATE SCHEDULES

Water Services - Monthly Fee Schedule:

A.  Single Family Residential Home: Residential Base Water Charge per month is $55.20, plus monthly water usage

      based on the following water usage:

  • 0 to 6,000 gallons $2.10 per 1,000 gallons

  • 6,000 to 20000 gallons $2.60 per 1,000 gallons

  • 20,000 and more gallons $3.40 per 1,000 gallons

B.  Large Domestic Water Usage Charges: Meter Size Charges

  • 1.5” Meter Size $82.60 per month

  • 2.0” Meter Size $128.70 per month

  • 3.0” Meter Size $268.20 per month

  • 4.0” Meter Size $390.20 per month

  • 6.0” Meter Size $780.10 per month

      Water usage rate will be the same rate as for Single Family Residential Home.  

C.  Multi Residential domestic customers shall pay a monthly meter charge based on size of meter, plus $39.60 per month per unit served

      and a water usage rate the same as for Single Family Residential Home.

D.  Commercial water usage charge base rate is $82.60 per month plus water usage, the same as for Single Family Residential Home.

E.  Construction water charge is $150.00 per month plus $2.60 per 1,000 gallons.

 

Sewer Services ‐ Monthly Fee Schedule:

A.  Single Family Residential Home base sewer charge shall be $60.70 per month.

B.  Multi Residential domestic customer shall pay $60.70 base charge per month per unit.

C.  Commercial Users: All classes shall pay $60.70 as a minimum charge and $4.25 per each 1,000 gallons in excess of 10,000 gallons

      per month as measured by water meter on the property. Also, customer will be responsible for any applicable surcharge as determined

      as EXTRA STRENGTH WASTE, which is identified as causing an increased cost of collection, treatment, disposal or administration.

D.  Sewer Service for commercial customers with non‐metered water will be charged based on fixture units calculated as per

      International Plumbing Code “IPC”.  A minimum charge of $60.70 per month will be for any commercial customer and will include

      up to 25 fixture units. Each fixture unit in excess of 25 shall have a charge of $2.75 per month associated with it.

New Water Services – Connection Fee Schedule

Connection fee shall be applied for all new connections within Churchill County service area:

A.  Small Private Residential connection privilege fee for meter size ¾” to 1.00” shall pay $7,200.00.

B.  Commercial connection fee for water services will be charged as per following schedule based on meter size:

  • ¾” meter size $7,000.00

  • 1.0” meter size $7,600.00

  • 1.5” meter size $9,200.00

  • 2.0” meter size $11,000.00

C.  Multi-family Housing units individually metered on parcels with a residential unit density less than or equal to 8 units per acre

      connection fee for water services will be $7,200.00 per each individual unit.

D.  Multi-family Housing units individually metered on parcels with a residential unit density equal to or more than 9 units per acre

      connection fee for water services will be $5,400.00 per each individual unit.

E.  Multi-family Housing using a single master meter per building, connection fee for water services will be charged as per the

      following scheduled based on service size:

  • ¾” service size $7,000.00

  • 1.0" service size $7,600.00

  • 1.5" service size $9,200.00

  • 2.0" service size $11,000.00

F.  Condominiums, and other developments which have "common areas", pools, etc., the connection fee for the common area

      service shall be based on the size of each service per section E above.

 

Wastewater Services ‐ Connection Fee Schedule

Connection fee shall be applied for all new sewer connections within Churchill County service area:

A.  Small Private Residential connection privilege fee for meter size ¾” to 1.00" shall pay $6,500.00.

B.  Multi-family Residential/Commercial/Industrial  connection privilege fee will be based upon the conversion of fixture units to

      Equivalent Residential Units (ERU) at twenty-five fixture units equaling one residential equivalent.

 

NOTE: Any construction, applicable permits and other expenses are sole customer responsibility.

-  -  -  -  -

**If the fifteenth of the month falls on a Saturday, Sunday or holiday, then payment is due on the next business day without penalty.